Title:
|
Committee Report: Public Property (Paper # 142-21) Petition: Cellco Partnership d/b/a Verizon, 118 Flanders Road, Westborough, MA Cellco Partnership d/b/a Verizon-installation of necessary telecommunication equipment and corresponding aerial fiber optic cable on National Grid owned Utility Poles; Verizon also to install antennae and appurtenant equipment and aerial fiber route; To collocate small wireless facilities (also referred to as "small cells" on existing wooden utility poles located within the public right of way at the following location 145 Cherry Street with the condition that equipment not be installed on any poles that are double poles or adjacent to double poles until National Grid replaces them and these installations do not include mechanical cooling devices or fans and the final electrical inspection for the purpose of releasing the electrical meter will not be performed at any location where a double pole exists.
|